Presented at
Suspended train in test before being installed in the tunnel of the Large Electron Positron collider. It looks like the mold has bended the trackage, but the face of the worker remains well visible (at the back of the train).
Suspended train in test before being installed in the tunnel of the Large Electron Positron collider. It looks like the mold has bended the trackage, but the face of the worker remains well visible (at the back of the train).